Well, things did happen while we we…

Well, things did happen while we were away but not really to our satisfaction. The toilet has been moved so it does look acceptable. One of the "ventthings" has been placed a bit wrong and it also is not usable, it is placed (we are guessing) upside down and the little string to pull is no longer pullable=it has no function. The wooden parts surrounding door and window is acceptable but not nice as it was before. They have not fixed the teak part at the door, it is a bit damaged and looks very, very old, earlier it looked brand new (they had some sort off tape on it to protect during the 9 weeks).

The painter, same sort of craftsmen we guess, considering the poor job he has done on the silicone added between the ceiling and walls and also we wonder who in the world did the silicone stuff by the washbasin, in the middle it looks as if they added dirt and nothing even looks as if it is anyway near even. The silicone in the corners ceiling and wall looks as if a little child has tried to handpaint.

They say cleaning will be done on Thursday but that seemingly only includes bathroom and hallway which is unacceptable considering the two times we had something similar to a sandstorm caused by the ignorant carpenter who did not use any plastic to cover as much as he possibly could which is normal practise while doing stuff like this.

Anyway, we accept none of the craftsmen that have been here. We will ask the carpenter in the family to redo the parts that do need to look nice and also need to be done better for practical use.

We still feel we won some even if it does not look as it did before they started.

Bookmark the permalink.

Lämna ett svar

Denna webbplats använder Akismet för att minska skräppost. Lär dig hur din kommentardata bearbetas.